Fergus Interiors
Call07399 201558

Services / Doors

Doors

Internal doors hung so a run of them shuts with the same weight, and FD30 sets hung to the gaps, seals and ironmongery the certificate actually requires, certified on completion.

Flush door hung in a slim black frame beside a glazed office partition

Internal doors hung and fitted to the opening they are going in, so a run of them shuts the same way. Linings replaced where they need to be, and the handles, latches and closers fitted at the same time.

FD30 fire door sets supplied and fitted as complete sets: door, lining, seals and hinges. Every set fitted is certified, so the paperwork is issued on completion.

Three stages

Measure, Hang, Finish

01Check the openings

Every opening is measured before anything is ordered, because in most houses no two are the same. That is also when it becomes clear whether a lining can stay or wants replacing.

Door hung square in its lining

02Hang

Each door is fitted to the opening it is going into, so a run of them ends up shutting the same way.

Door set with vision panels, lining taped ready for decoration

03Ironmongery and certification

Handles, latches and closers are fitted as part of the same visit. Fire doors are certified once the job is finished.

Common questions

Can you certify the fire doors you fit?

All fire doors are fully certified.

Can you hang doors that have already been bought?

Yes. Supplied doors are fine for internal work. Fire doors are different: the door, lining, seals and hinges all have to be certified as a set, so it is worth a conversation before anything is ordered.

Will a run of doors all shut the same?

That is the point of doing them together. Each one is scribed to its own opening rather than trimmed to a number, and the gaps are set so they stay right after a winter of heating.

Do you fit the ironmongery as well?

Yes. Hinges, latches, handles and closers go on as part of the job, not as a separate visit.

Is the quote free?

Yes. Quotes are free and fixed, and you get the price before any work starts rather than a bill that moves once the job is under way.

Often booked alongside

Carpentry · Studwork & dry lining · Flooring

Tell me about the doors

Quotes are free and fixed, with the price agreed before any work starts. Ring during the day or send the form, and you will have a reply the same evening.